Consistent 5 mm Glass Gaps and Concealed Packers

Particularly on the panoramic courts, the team maintained a consistent 5 mm gap between glass panels and accurate alignment at each corner.

​

On the standard courts, small packers were concealed in the corners to support the glass in the areas most susceptible to settling.

haiduks_padel_fixed_points.jpg.jpg
haiduks_padel_leiden-fixed_points.jpg

Setting Out to Existing Fixed Points

We set out all 11 courts against the metal elements and drilled holes already in place, keeping each court precisely within the specified layout.

​

Two crews, one of two installers and one of three, completed the structural and glass installation in 24 days.

Technical Solutions

haiduks_padel_padel_court_edited.jpg

One-Year Workmanship Guarantee

Our installation work carries a one-year workmanship guarantee.

The StarPoint Padel courts were installed between June and July 2026.

haiduks_padel_court_structure.jpg

Zero Stoppages, Zero Rework

Across both the structural and turf stages, the installation was completed without stoppages or rework. Decisions were coordinated jointly, and the club opened on schedule.

Project Validation

turf_installation_correction.jpg
floor_correction.jpg

Floor Correction During Turf Installation

During turf installation, the team identified uneven areas in the floor on several courts. Left uncorrected, these irregularities could have created dead spots where the ball does not bounce.

 

Our concrete specialist levelled the affected areas before turf installation continued.

 

A team of three then installed 2,200 m² of court turf and 1,440 m² of perimeter turf in 8 days, including the cutting and joining required across multiple separate perimeter sections.

Client Feedback

“... ” 

Howard Scott, General Manager, City Padel Taunton

team_project_plan.jpg

Schedule Your Strategic 
Session

Submit project parameters below to schedule a targeted, 30-minute technical alignment session with our engineering division

Area:

· 2,200 m² court turf

· 1,440 m² perimeter turf

Timeline:

· 24 days structure

· 8 days turf

Scope:

11 courts: 6 panoramic,

5 standard

Location & Court System:

· Leiden, The Netherlands

· Serena Padel

The objective

StarPoint Padel's club in Leiden required the full installation of 11 Serena Padel courts: six panoramic and five standard.

​

The site already had metal elements installed and holes drilled, so each court had to align precisely with the existing fixed points while following the layout specified by the client.