FOCUS Health & Fitness
- Court Installation

Area

258 m² Perimeter Turf

Timeline:

16 Days

Scope:

3 Full Panoramic Courts

Location:

Middelharnis, Netherlands

The Objective

Assembling a newly designed, completely panoramic court system from the manufacturer without on-site factory support. The project required absolute dimensional accuracy to pass strict municipal athletic federation testing and prevent structural glass load errors during high-volume usage.

FOCUS Health Fitness

Precision Expansion Joints

Padel courts outdoors shift under wind and temperature changes. We maintained an exact 5 mm clearance gap between all perimeter glass panes to allow natural structural expansion and contraction without generating internal stress in the material.

FOCUS Health Fitness

Polymer Sealing Instead of Plastic Connectors

We bypassed the standard, low-durability plastic glass connectors. Instead, we aligned the heavy-duty tempered glass panels and sealed all vertical joints using high-modulus structural silicone. This distributed physical impact loads evenly across the glass wall and created an uninterrupted panoramic view.

Technical Solutions

FOCUS Health Fitness

10-Month Performance Check

During a scheduled inspection 10 months post-installation, we verified zero structural drift. The steel frame, alignment axes, and glass-to-metal clearances remained in perfect factory tolerance.

FOCUS Health Fitness

Precision Expansion Joints

The completed courts passed the stringent KIWA safety and performance audit on the first inspection. This officially certified the facility for international tournament play.

Project Validation

FOCUS Health Fitness

Client Feedback

Achmed Rashid, Owner, Focus Health & Fitness

Client Testimonial

Haiduks_padel_installation_team.jpg

Schedule Your Strategic 
Session

Submit project parameters below to schedule a targeted, 30-minute technical alignment session with our engineering division