City Padel Exeter -
Court Restoration

Status:

Fully Repaired & Operational

Scope:

6 Indoor Panoramic Courts

Location:

Exeter, United Kingdom

The Challenge

Six indoor courts, turf only two years old, and players were already complaining. One court had visible bubbles across the surface. On another, the turf had lifted at the seams and moved underfoot.

The club was preparing to replace the turf outright.

We were asked to inspect it first.

silicone.jpg
Haiduks_Padel_turf.jpg

Seams Never Properly Bonded

Across all six courts, the seams had been poorly bonded and had pulled apart. Several were filled with silicone instead of adhesive, which does not hold a joint under playing traffic.

Sand Trapped Beneath the Carpet

The bubbles were not a turf defect. Sand had worked its way under the carpet through open seams and compacted into ridges beneath the surface.

Haiduks_Padel_inspection.jpg

Diagnostic Findings

Our team audited all six courts and found three separate faults.

alex_sand_under_turf.jpg
Haiduks_Padel_diagnosis.jpg

Bounce Loss Along the Joints

Sand and debris sitting in the open seams killed the ball response along the joint lines. Players felt it as dead spots rather than as a seam problem.

alex and a client.jpg

Maintenance Protocol Handover

We left the club a recommendation: when to top up sand, how to check the seams, and how often to run maintenance. Turf wear was assessed and flagged for replacement in twelve months.

Bubble Extraction

On the bubbled court, we opened the nearest seam, vacuumed out the compacted sand that had formed the ridges, then refitted and rebonded the joint. The surface came back flat without lifting or replacing any turf.

Seam Recut and Rebond

Every failed seam was cleared of sand and debris, cut back to clean edges, realigned and bonded again. Once the adhesive had cured, we topped the repaired lines with sand to add weight and bring the surface flush.

Technical Solutions

finished courts4.jpg
repair.jpg

Replacement Deferred by a Year

The club had been costing a full turf replacement. The repair bought another twelve months of service from the existing surface.

finished courts10.jpg

Dead Spots Eliminated

Ball response is consistent along every repaired seam. The joint lines no longer read as dead spots underfoot.

The Outcome

finished courts8.jpg
finished courts6.jpg

All Six Courts Back in Play

All six courts returned to full playing condition, and the complaints that triggered the audit stopped.

Haiduks padel installation team

Schedule Your Strategic 
Session

Submit project parameters below to schedule a targeted, 30-minute technical alignment session with our engineering division

Client Feedback

"The courts were slightly bobbling and lifting, so you've come and done a fantastic job doing repairs by removing the sand from underneath where there was ridges and gluing them back down."

Noel Brandson, Club Owner, City Padel Taunton

bottom of page